PROJECT DETAILS

Investor: Laos - Korea - Thailand joint venture Location: Xenamnoy River in two provinces of Champask and Attapeu Laos Total construction value: 171.1 billion VND Construction period: 36 months Construction items: Digging, embankment, concrete Factory, pressure pipeline and power distribution station

CMVietnam (now CMH Group) has signed a contract to build Xayabury – Laos hydropower project with partner Ch. KarnChang (Thailand). According to the signed contract, CMVietnam (now CMH Group) constructs concrete items in two phases, with a total volume of 316,000 m3 of concrete. The Xayabury hydroelectric project is located on the Mekong River in the north of the Lao People’s Democratic Republic, with the purpose of providing electricity to Thailand and Laos.