PROJECT DETAILS

Investor: Southern Hydropower Joint-Stock Company as an investor Location: Lam Dong Province, Vietnam Total construction value: VND 02 billion Construction period: 02 months Construction items: Executed the whole drilling and reinforcement work for two water tunnel

Dasiat Hydropower Project located in Bao Lam district, Lam Dong province. This work was built on DasiatRiver and jointed with national grid by 220 KV wire of 19 kilometers length to the 110 KV transformer station on the scale of Dak Nong. Dasiat Hydropower Plant designed capacity of 13,5 MW and the average production of 58 million kwh with Southern Hydropower Joint-Stock Company as an investor.

For the tunnel route of about 2 kilometers, a relatively complicate item because of unstable geology, Cavico Hydropower Construction JSC was selected to be the contractor of this energy route execution.

Under the contract signed with Cavico Hydropower Construction, Cavico CMS (now CMH Group) would execute drilling, reinforcement of the water tunnel; the construction volume was about 1000m drilling length. With the experience and determination of Cavico CMS personnel, the whole work volume had been completed within 02 months.