PROJECT DETAILS

Investor: Laos - Korea - Thailand joint venture/EPC Contractors: SK Engineering & Construction Ltd Location: Champask and Attapeu provinces, Lao PDR Total construction value: 171.1 billion VND Construction period: 36 months Construction items: Digging, embankment, concrete Factory, pressure pipeline and power distribution station

The project is located on the Xe Kong River, which is 480 km long, originating from the eastern slopes of the Truong Son Mountain Range in Thua Thien Hue Province, flowing through southern Laos, into Cambodia, and eventually joining the Mekong.

CMH Group  has  completed  their 100%  of overall  the Contract’s  works.  These  are compliance  with  the technical  specification, schedule and project requirements:

Đường ống áp lực bê tông cốt thép có chiều dài L = 788,00m, rộng B = 4,60m, cao H = 4,90m

Nhà máy thủy điện gồm 3 tuabin pelton có công suất 3×124   MW (372 MW),  Kích thước  100,0 x 33,75 x 51,50m

Trạm phân phối điện 230KV và 115KV

Kênh dẫn bê tông cốt thép có chiều dài L = 113,00m; chiều rộng B = 14,00m; chiều cao H = 18,0m

Kênh tiêu nước bê tông cốt thép có chiều dài L = 576,00m; chiều rộng B = 3,80m; chiều cao H = 3,90m

Cầu bê tông cốt thép có chiều dài L = 42,00m; chiều rộng B=26,00m

Cống hộp bê tông cốt thép có chiều dài L = 400,76m; chiều rộng B = 5,20m; chiều cao H = 2,30m

Kè gia cố mái kênh bằng rọ đá hộc dài 2500m; rộng đáy 20m; mái cao 5m

Kiến trúc: bao gồm các công việc xây dựng phụ trợ nhà máy: Sơn, trần, nền…

Cơ khí: Bao gồm lắp đặt các hệ thống thông gió điều hòa, cấp thoát nước, điện nhẹ và điện chiếu sáng, thông tin liên lạc, báo cháy và phòng cháy chữa cháy nhà máy và các trạm phân phát điện Pakse và Switchyard