CMVietnam (now CMH Group) has signed a contract to build Xayabury – Laos hydropower project with partner Ch. KarnChang (Thailand). According to the signed contract, CMVietnam (now CMH Group) constructs concrete items in two phases, with a total volume of 316,000 m3 of concrete. The Xayabury hydroelectric project is located on the Mekong River in…
Location: Mekong River Laos
Construction items:
Concrete spillway, energy dissipation yard, Factory
Total construction value:
112 billion VND
The project is located on the Xe Kong River, which is 480 km long, originating from the eastern slopes of the Truong Son Mountain Range in Thua Thien Hue Province, flowing through southern Laos, into Cambodia, and eventually joining the Mekong. CMH Group has completed their 100% of overall the Contract’s works. These are compliance …
Location: Champask and Attapeu provinces, Lao PDR
Construction items:
Digging, embankment, concrete Factory, pressure pipeline and power distribution station
Total construction value:
171.1 billion VND