The Kinh Mon Trading Center Investment Project locates in the town center which is a district administrative center, lies on the provincial trade route of Hai Phong – Hai Duong – Quang Ninh. Kinh Mon commune level- town is under the process of developing into Kinh Mon district level –town in the future. In Kinh…
Location: Hai Duong Province, Vietnam
Construction; Architecture and M&E
VND 30 billion
The project of executing and reinforcing the stone transport tunnel of Nghi Son Cement Factory; the length of the factory tunnel was 2.2 kilometers. Nghi Son Cement Company was the Joint Venture of Vietnam Cement Corporation and two Japanese multinational corporations those were Taiheiyo Cement Company and Mitsubishi Material. This Joint Venture was established on…
Location: Thanh Hoa Province, Vietnam
Executing and reinforcing the stone transport tunne
VND 17.5 billion
Construction items: Tunnel of 4.3 kilometers length and 3.8 diameter; auxiliary tunnel of 500 meters length; surge tank of 125 meters height, vertical well of 79 height and water intake gate With the capacity of 42 MW project, there are two machine groups of 21 MW. The investment capital was about 1.000 billion dong. CMH…
Location: Ha Giang Province, Vietnam
Tunnel of 4.3 kilometers length and 3.8 diameter; auxiliary tunnel of 500 meters length; surge tank of 125 meters height, vertical well of 79 height and water intake gate
VND 192 billion
Construction items: Song Bung bridge with the length of 156.35 meters consisting of 6 spans, each span was 24 meters Belonging to the Package 4 of Road execution and Parum B Resettlement Zone under the Song Bung 4 Hydropower Project Applying the ramming execution method by pooctic bearings, use two T beams with 24 meters…
Location: Quang Nam Province, Vietnam
Song Bung bridge with the length of 156.35 meters consisting of 6 spans, each span was 24 meters
VND 13.8 billion
Song Tranh Hydropower 2 located in the Thu Bon river system belonging to Bac Tra My District, Quang Nam Province. Song Tranh Hydropower had a capacity of 190 MW, the average production reached 679.6 million. In accordance with contract, CMVietnam (now CMH Group) participated in reinforcing tunnel housing and water intake gate with the contract…
Location: Quang Nam Province, Vietnam
Reinforcing tunnel housing and water intake gate
VND 04 billion