This is Red Mud Lake project which belongs to Alumin Nhan Co factory, located in Nhan Co village, Dak R ‘Lap district, Dak Nong province, consisting of an ore bauxite factory and an alumina production factory with a capacity of 650,000 tons/year. CMVietnam (now CMH Group) has been assigned construction items by the Owner that...
Location: Nhan Co village, Dak R'Lap district, Dak Nong province
Construction items:
Executing cofferdam: Height 22,6 5 meters, length 430 m3, the quantity: backfilling 190.000 m3, excavation 43.600 m3 soil, concreting 4.016 m3
Total construction value:
VND 128 billion
On 25th, February 2017, the investor – Deo Ca Investment ,.JSC, CMH Group and SBRC has officially held the Ground-breaking Ceremony to start Hai Van 2 Expansion project, package HV2-XL2.1 Hai Van Road Tunnel Expansion Project has a length of 6.2 km, width 9.75 m, static tunnel of 5 m, 2 lanes, maximum speed allowed...
Location: Da Nang and Hue
Construction items:
Digging, embankment, concrete Factory, pressure pipeline and power distribution station
Total construction value:
VND 73 billion
This is the third project signed between CMVietnam (now CMH Group) and Vietnam National Coal – Mineral Industries Holding Corporation Limited – Vinacomin, following Khe Cham III and Red Mud Lake project. Nong Son thermoelectric plant whose Employer is Nong Son Coal – ElectricityJoint Stock Company has capacity of 30 MW, consumes 110,000 tons of...
Location: Ulu Jelai - Cameron Highlands - Pahang - Malaysia
Construction items:
Supplying manpower for machinery operation
Total construction value:
VND 71 billion
This is a contract between CMVietnam (now CMH Group) and its Malaysian partner in the 382MW hydropower project, by which CMVietnam has, since 2012, supplied manpower for operating tunnel construction machines such as tunnel drillring machines (Jumbos), excavators, and shotcrete robots for the construction of a 26 kilometers water tunnel and dam.
Location: Ulu Jelai - Cameron Highlands - Pahang - Malaysia
Construction items:
Supplying manpower for machinery operation
Total construction value:
VND 71 billion
Construction items: Executing and concreting pits level at -300: Quantity: the length of pit is 1.430 meters; the quantity of concreting is 7150 m3. Executing of pits which are preparing to product in 2015: Upper transportation pit level at -90 -:- +25: Quantity: the length is 825 meters; the quantity of concreting is 1.200 m3...
Location: Quang Ninh Province, Vietnam
Construction items:
Executing and concreting pits
Total construction value:
VND 151.3 billion