East West Expressway Project – Algeria

This is the East-West Highway project in Algeria (Construction de I’Autoroute Est/Ouest du lot Unique Est at Algeria). CMVietnam (now CMH Group) has signed a contract with a partner, the Japanese contractor consortium COJAAL (Consortium Japonais Pour I’Autoroute Algerienne) to construct two double tunnels with a total length of about 4.6 km in the bidding…

Location: City of Constantine, Algeria

Construction items:

Traffic tunnel route

Total construction value:

450 billion VND

View more

RED MUD LAKE PROJECT – DAK NONG PROVINCE

This is Red Mud Lake project which belongs to Alumin Nhan Co factory, located in Nhan Co village, Dak R ‘Lap district, Dak Nong province, consisting of an ore bauxite factory and an alumina production factory with a capacity of 650,000 tons/year. CMVietnam (now CMH Group) has been assigned construction items by the Owner that…

Location: Nhan Co village, Dak R'Lap district, Dak Nong province

Construction items:

Executing cofferdam: Height 22,6 5 meters, length 430 m3, the quantity: backfilling 190.000 m3, excavation 43.600 m3 soil, concreting 4.016 m3

Total construction value:

VND 128 billion

View more

SONG TRANH 2 HYDROELECTRIC PROJECT

Song Tranh Hydropower 2 located in the Thu Bon river system belonging to Bac Tra My District, Quang Nam Province. Song Tranh Hydropower had a capacity of 190 MW, the average production reached 679.6 million. In accordance with contract, CMVietnam (now CMH Group) participated in reinforcing tunnel housing and water intake gate with the contract…

Location: Quang Nam Province, Vietnam

Construction items:

Reinforcing tunnel housing and water intake gate

Total construction value:

VND 04 billion

View more

BUON KUOP HYDROELECTRIC PROJECT

Buon Kuop Hydropower Project had a capacity of 280 KWh with two parallel tunnels and 02 generator groups. Commenced on January 21st 2003, Buon Kuop Hydropower’s nodal route consisted of main dams and overflow dam arranged on Serepok river; the energy route included water intake gate, water tunnel, surge tank, pressure pipes, plant – discharge…

Location: Dak Lak Province, Vietnam

Construction items:

Executed the whole drilling and reinforcement work for two water tunnel

Total construction value:

VND 20 billion

View more

DASIAT HYDROPOWER PROJECT

Dasiat Hydropower Project located in Bao Lam district, Lam Dong province. This work was built on DasiatRiver and jointed with national grid by 220 KV wire of 19 kilometers length to the 110 KV transformer station on the scale of Dak Nong. Dasiat Hydropower Plant designed capacity of 13,5 MW and the average production of…

Location: Lam Dong Province, Vietnam

Construction items:

Executed the whole drilling and reinforcement work for two water tunnel

Total construction value:

VND 02 billion

View more
  • 1
  • 2
  • 3
  • 4

HEADQUARTER

12th floor, Intracom 2 Building, 33 Cau Dien, Phuc Dien ward, Bac Tu Liem district, Hanoi, Vietnam
(+84) 243 5738 555
www.cmhgroup.vn
info@cmhgroup.vn

REPRESENTATIVE OFFICE

No. 269A Hoa Khe, Cam Khe town, Cam Khe district, Phu Tho province, Vietnam

(+84) 243 5738 555
www.cmhgroup.vn
info@cmhgroup.vn
Copyright © 2025 CMH Group. All rights reserved.
  • Home
  • About Us
  • Shareholders
  • Business
  • Projects
  • News
  • Careers
  • Contact