PROJECT DETAILS

Investor: Tenaga Nasional Berhad - Spain Location: Ulu Jelai - Cameron Highlands - Pahang - Malaysia Total construction value: VND 71 billion Construction period: 04/2012-04/2015 Construction items: Supplying manpower for machinery operation

This is a contract between CMVietnam (now CMH Group) and its Malaysian partner in the 382MW hydropower project, by which CMVietnam has, since 2012, supplied manpower for operating tunnel construction machines such as tunnel drillring machines (Jumbos), excavators, and shotcrete robots for the construction of a 26 kilometers water tunnel and dam.