Investor:
Song Bac Hydropower Joint-Stock Company
Location:
Ha Giang Province, Vietnam
Total construction value:
VND 192 billion
Construction period:
27 months
Construction items:
Tunnel of 4.3 kilometers length and 3.8 diameter; auxiliary tunnel of 500 meters length; surge tank of 125 meters height, vertical well of 79 height and water intake gate
Construction items: Tunnel of 4.3 kilometers length and 3.8 diameter; auxiliary tunnel of 500 meters length; surge tank of 125 meters height, vertical well of 79 height and water intake gate
With the capacity of 42 MW project, there are two machine groups of 21 MW. The investment capital was about 1.000 billion dong.
CMH Group obtained the package of energy route execution of 192 billion dong, including items: the main tunnel of 4.3 kilometers length and 3.8 diameter; auxiliary tunnel of 500 m length; surge tank of 125 meters height, vertical well of 79 height and water intake gate.