PROJECT DETAILS

Investor: Vietnam Electric Corporation (EVN) Location: Quang Nam Province, Vietnam Total construction value: VND 04 billion Construction period: 06 months Construction items: Reinforcing tunnel housing and water intake gate

Song Tranh Hydropower 2 located in the Thu Bon river system belonging to Bac Tra My District, Quang Nam Province. Song Tranh Hydropower had a capacity of 190 MW, the average production reached 679.6 million.

In accordance with contract, CMVietnam (now CMH Group) participated in reinforcing tunnel housing and water intake gate with the contract value of 4 billion dong.